Geophysical Construction Control Measurement and Video Inspection for New GWM
Geophysical construction control measurements and video camera inspection: Performed on 5 (replacement) new groundwater monitoring wells (GWM) and one infiltration well at the Schwelereigelände Deuben. The service is for monitoring purposes of 6 boreholes with a planned final depth between 12 and 45 m below ground level (GOK). Construction involves PVC/HDPE with an approximate DN 115 diameter. Planned geophysical procedures include video inspection, Segmented Gamma-Log, Focused Electro-Log, Density Annulus Scanner, and Magnetic Log. Interpretation and presentation of results are part of the service.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- 25724232NON-RESTRICTED-DOCUMENT
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.