Skip to main content
Activeted-509366-2026

Ahr River Restoration, Altenahr Sub-project, Construction Section BA02a

Relocation and reorganization of utility and disposal lines in the 'Im Wallgarten / Ahrpromenade' area for the Ahr river restoration: construction of a bundled infrastructure trench over approx. 270 m; new installation of a local gas pipeline DN 250 PE, a gas transport pipeline DN 225 PE, a drinking water transport pipeline DN 225 PE, and additional media and empty conduit systems; reorganization of wastewater infrastructure with a rainwater sewer DN 200, a sewage collector DN 500, and a wastewater pressure pipeline DN 160 PE; adaptation of existing house connections; dismantling of existing provisional lines and an asbestos cement sewage collector; construction of an L-shaped retaining wall to protect the newly laid infrastructure; execution in several construction sections with phased changeovers to ensure supply and disposal during the construction period.

CONTRACTING AUTHORITY

Name

Kreisverwaltung Ahrweiler - Stabsstelle Hochwasserresilienz und Aufbaukoordination

City

Bad Neuenahr-Ahrweiler

Country

DE

Website

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45112000, Excavating and earthmoving work.

Other CPV

45200000, Works for complete or part construction and civil engineering work.

45247110, Canal construction.

45232410, Sewerage work.

45112200, Soil-stripping work.

45232150, Works related to water-distribution pipelines.

44163111, Drain pipes.

45110000, Building demolition and wrecking work and earthmoving work.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

No

Electronic Submission

Required

Legal Basis

32014L0024

17 days remaining

Similar Tenders

Explore CPV 45

Site setup for Ahr river restoration, Walporzheim sub-project

Site setup for the Ahr river restoration in the urban area of Bad Neuenahr-Ahrweiler, sub-project BNA230 Walporzheim, construction phase 02: Establishment of the overarching site setup including utility connections, traffic safety, and other equipment such as a tire wash facility. Setup is to be completed by early November 2026, with operation until December 2029.

Kreisverwaltung Ahrweiler - Stabsstelle Hochwasserresilienz und Aufbaukoordination

·Bad Neuenahr-Ahrweiler
Deadline:August 31, 2026
€75M

Construction Works for Nuppulinna-Jokela RU2 and Hyvinkää-Riihimäki Pre-loadings

Construction works for the Nuppulinna-Jokela RU2 section and Hyvinkää-Riihimäki pre-loadings: complete construction works for the Nuppulinna-Jokela section, excluding internal safety device works, works specified as not part of the contract in the tender documents, and already completed structures. For the Hyvinkää-Riihimäki section, works include pre-loading structures, counter-embankments, maintenance and private road arrangements, catenary foundations, and catenary works. The contract comprises earthworks, substructure and superstructure works, catenary, heavy current, and lighting works, external safety device works, road and street construction works, structural works, and noise protection structures. Conditional construction works linked to funding decisions from Tuusula municipality, Tuusula Water, and Senaatti Properties are also included; funding will be confirmed during the tender phase at the latest. Optional works are included for the Jokela-Hyvinkää (km 49+620 - 59+000) and Hyvinkää-Riihimäki (km 59+000 - 68+140) sections, covering pre-loading structures, counter-embankments, excavation, culvert extensions, underpasses, road, street, and maintenance roads and their modifications, cable routes, embankments, catenary foundations, cable and line relocations and protections, environmental protection measures, and works not included in the Jokela station western side contract. Options can be called off during the contract period in one or more parts, based on unit prices from the contractor's tender or at cost price.

Väylävirasto

·FI1B1
Deadline:August 17, 2026
€160,000

Paving Works 2026

Paving works: Unit price total contract for the Municipality of Janakkala.

Janakkalan kunta

·FI1C2
Deadline:August 10, 2026
0

Main Ditch Excavation Works for Land Consolidation in Nivala-Haapaperä and Karvoskylä

Main ditch excavation works for land consolidation in Nivala-Haapaperä and Karvoskylä: includes work, materials, and aggregate. The main drainage works are divided into the Haapaperä division area (channels 1-9ab) with 10,021 m of ditches and the Karvoskylä division area (channels 10-15) with 6,496 m of ditches.

Maveplan Oy

·FI1D9
Deadline:August 03, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now