Ahr River Restoration, Altenahr Sub-project, Construction Section BA02a
Relocation and reorganization of utility and disposal lines in the 'Im Wallgarten / Ahrpromenade' area for the Ahr river restoration: construction of a bundled infrastructure trench over approx. 270 m; new installation of a local gas pipeline DN 250 PE, a gas transport pipeline DN 225 PE, a drinking water transport pipeline DN 225 PE, and additional media and empty conduit systems; reorganization of wastewater infrastructure with a rainwater sewer DN 200, a sewage collector DN 500, and a wastewater pressure pipeline DN 160 PE; adaptation of existing house connections; dismantling of existing provisional lines and an asbestos cement sewage collector; construction of an L-shaped retaining wall to protect the newly laid infrastructure; execution in several construction sections with phased changeovers to ensure supply and disposal during the construction period.
CONTRACTING AUTHORITY
Name
Kreisverwaltung Ahrweiler - Stabsstelle Hochwasserresilienz und Aufbaukoordination
City
Bad Neuenahr-Ahrweiler
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45112000, Excavating and earthmoving work.
Other CPV
45200000, Works for complete or part construction and civil engineering work.
45247110, Canal construction.
45232410, Sewerage work.
45112200, Soil-stripping work.
45232150, Works related to water-distribution pipelines.
44163111, Drain pipes.
45110000, Building demolition and wrecking work and earthmoving work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
17 days remaining(LOT-0001)
Published