Heating and Sanitary Installations for the New Family Pool in Pfungstadt
Heating and sanitary installations: 2x brine heat pump 70 kW, 2x split air-to-water heat pump 78 kW, 2x CHP unit 15/37kW, 2x condensing boiler system 75 kW, 3x buffer storage tank 2,000 L, 1x buffer storage tank 1,000 L, 19x high-efficiency heating pump, control and shut-off valves, heating pipes made of stainless steel and C-steel, insulation work on heating pipes, 2x fresh water station up to 270 kW, 1x fresh water station 40 kW, water softening system up to 30 m³/h, 127x floor drain, 45x shower, 27x washbasin, 25x toilet, 9x urinal, hygiene management system, control and shut-off valves, approx. 270 m PE wastewater pipes, approx. 1,615 m stainless steel drinking water pipes (cold/hot water), 490 m cold drinking water pipe made of PE-HD.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 558480-2026HTML
- TED PDF — 558480-2026PDF
- TED XML — 558480-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.