Heating and Sanitary Installations for the New Family Bath in Pfungstadt
Heating and sanitary installations: 2x brine heat pump 70 kW, 2x split air-water heat pump 78 kW, 2x CHP unit 15/37kW, 2x condensing boiler system 75 kW, 3x buffer storage tank 2,000 L, 1x buffer storage tank 1,000 L, 19x high-efficiency heating pump, control and shut-off valves, heating pipes made of stainless steel and C-steel, insulation work on heating pipes, 2x fresh water station up to 270 kW, 1x fresh water station 40 kW, water softening system up to 30 m³/h, 127x floor drain, 45x shower, 27x washbasin, 25x toilet, 9x urinal, hygiene management system, control and shut-off valves, approx. 270 m wastewater pipes made of PE, approx. 1,615 m drinking water pipes CW/HW made of stainless steel, 490 m cold drinking water pipe made of PE-HD.
CONTRACTING AUTHORITY
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45212212, Construction work for swimming pool.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
9 days remaining(LOT-0001)
Published