Heating Systems for Ward Building E2 (BA2)
Installation of heating systems in Ward Building E2 (BA2): complete, ready-for-operation installation including piping network (stainless steel press-fit and steel pipe versions), fittings, thermal insulation, fire protection measures, radiator systems, and all necessary fastening, connection, testing, and ancillary services. Delivery, assembly, placement, and commissioning of all system components, coordination with other trades.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 564078-2026HTML
- TED PDF — 564078-2026PDF
- TED XML — 564078-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.