Skip to main content
Activeted-514762-2026

Manufacturing, delivery, and installation of bicycle parking systems

Manufacturing, delivery, and on-site installation of standardized bicycle parking systems for train stations as part of the "Bike & Ride Offensive". This includes, in particular, row-type bicycle racks (high-low adjusters, single and double-sided) and double-decker bicycle parking systems (high-low adjusters, single and double-sided). The systems must be compatible with those of Kienzler Stadtmobiliar GmbH; dimensions are defined in Annex 6. The "Bike & Ride Offensive" supports municipalities in expanding bicycle parking facilities at train stations, with municipalities at approximately 1,000 stations registered and facilities already built at over 300 stations. The National Climate Initiative (NKI) is currently limited in duration until the end of 2027, with a possible extension.

CONTRACTING AUTHORITY

Name

DB InfraGO AG

City

Berlin

Country

DE

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Supplies

Main CPV

44212300, Structures and parts.

Other CPV

14622000, Steel.

44210000, Structures and parts of structures.

14622000, Steel.

44210000, Structures and parts of structures.

14622000, Steel.

44210000, Structures and parts of structures.

14622000, Steel.

44210000, Structures and parts of structures.

LOTS (4)

LOT-0001Supplies

Herstellung, Lieferung und Montage von Reihenbügelanlagen (Nord)

LOT-0002Supplies

Herstellung, Lieferung und Montage von Doppelstockparkern (Nord)

LOT-0003Supplies

Herstellung, Lieferung und Montage von Reihenbügelanlagen (Süd)

LOT-0004Supplies

Herstellung, Lieferung und Montage von Doppelstockparkern (Süd)

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

Yes

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

31 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

31 days remaining

Similar Tenders

Explore CPV 44

Replacement and Renewal of Railway Overpass Gotha - Gotha Ost, Salzgitterstraße

Replacement construction of a railway overpass over a federal road in an urban area for a single-track, non-electrified line: demolition of the existing structure (742 m³), construction of a reinforced concrete half-frame in an adjacent position, insertion of the structure, 1,016 m³ of emission-reduced concrete, 270 m² of shoring work, 6,900 m³ of earth excavation (of which 2,000 m³ for re-installation), 4,700 m³ of supplied earth material installation, track work over 50 m, road work over 75 m, temporary dewatering for surface and perched water, and related services for signaling and control technology (LST), telecommunications (TK), and cable civil engineering (KT).

DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)

·Frankfurt Main
Deadline:August 04, 2026

Road Overpass km 23.821 Steinebach a. Wörthsee, Line 5541

Railway construction works for the road overpass at km 23.7 in Steinebach a. Wörthsee.

DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)

·Frankfurt Main
Deadline:September 09, 2026

BIM Planning for Seddin-Lienewitz Railway Overpass, Line 6119 km 32.615

BIM planning services: service phases 1 and 2, optional service phases 3, 4, and 6.

DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)

·Frankfurt Main
Deadline:August 24, 2026

Project Management for 2nd S-Bahn Main Line Munich

Project management services for the 2nd S-Bahn Main Line Munich project: Ensuring budget-compliant, on-schedule, and quality-assured project execution according to qualitative and quantitative requirements through transparent, continuous, cross-subproject, and proactive control.

DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)

·Frankfurt Main
Deadline:September 01, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now