Hydroenergy system for water energy recovery (DN 200) for LW Bogdanka mine, incl. grid and fire protection integration
Status
Active
Submission Deadline
34 days remaining
Contracting authority
Lubelski Węgiel Bogdanka S.A. w Bogdance5 more open tenders view
Location
Puchaczów, Poland
Procedure
Open Procedure · Supplies
Category
Turbine generator sets.Electrical installation work.Engineering design services for the construction of civil engineering works.
Published
Reference
ted-550801-2026
Source
Installation of a hydroenergy system for energy recovery from discharged water from the surface to level 795 via a DN 200 pipeline for the LW Bogdanka mine, including integration of the system into the mine's power grid and fire protection system. This is a sectoral contract; further details are available in the tender documents.
Free
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 550801-2026HTML
- TED PDF — 550801-2026PDF
- TED XML — 550801-2026XML
Free
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.
Additional details
EU Funded
Yes
Electronic Submission
Allowed
Legal Basis
32014L0025