Skip to main content
All tenders

Hydroenergy system for water energy recovery (DN 200) for LW Bogdanka mine, incl. grid and fire protection integration

Status
Active
Submission Deadline
34 days remaining
Contracting authority
Location
Puchaczów, Poland
Procedure
Open Procedure · Supplies
Category
Turbine generator sets.Electrical installation work.Engineering design services for the construction of civil engineering works.
Published
Reference
ted-550801-2026

Installation of a hydroenergy system for energy recovery from discharged water from the surface to level 795 via a DN 200 pipeline for the LW Bogdanka mine, including integration of the system into the mine's power grid and fire protection system. This is a sectoral contract; further details are available in the tender documents.

Free

Never miss a tender again

We send you 3 current matches that fit your company.

With a number we call briefly to sharpen your search profile.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email and, if you leave a number, calls you once about it. Revocable at any time. Privacy policy


Tender documents

  • Portal — LOT-0000NON-RESTRICTED-DOCUMENT
  • TED HTML — 550801-2026HTML
  • TED PDF — 550801-2026PDF
  • TED XML — 550801-2026XML
Free

Unlock documents for free

Enter your email address. If you confirm, we will also send you 3 similar tenders.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email. Free, unsubscribe anytime. Privacy policy


Additional details

EU Funded
Yes
Electronic Submission
Allowed
Legal Basis
32014L0025
Live webinar

See Patterno work on a real tender

45 minutes live, questions answered in the chat. Upcoming dates on the signup page.

  • Matches from 4,500+ portals in one workspace
  • Qualify any tender against your criteria in minutes
  • Prepare bid documents from your company context

Prefer a private session?