Engineering services for replacement new construction of three bridge structures and track and overhead line planning in Berlin
Engineering services: Demolition, dismantling, and new construction of three tram bridges (BW 05b, 06b, 07b) in the Berlin Marzahn-Hellersdorf district, including the modification of the staircase at BW 06b. The planning involves restoring efficient traffic infrastructure while maintaining traffic flow (motor vehicles, pedestrian and bicycle traffic, public transport, long-distance traffic) during construction. Coordination with third parties (including SenMVKU, Deutsche Bahn AG, Berliner Wasserbetriebe) and integration of BVG requirements for traffic facilities (tracks, technical equipment). The 'S Springpfuhl' stop must be developed to be barrier-free, with a platform length of at least 62 m and an entry height of 22 cm above SOK. The track construction planning for the three tram bridges and the barrier-free development of the stops are combined into a single overall project.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 611027-2026HTML
- TED PDF — 611027-2026PDF
- TED XML — 611027-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.