Installation of Heating, Ventilation, and Air Conditioning Systems for the BA 03 Training Center of the Saxon Police University (FH) Rothenburg
Installation of heating, ventilation, and air conditioning systems: 1 air handling unit (AHU) with 26,250 m³/h (air treatment functions: heating, cooling, humidifying, heat recovery: run-around coil system), 1 AHU with 14,145 m³/h (air treatment functions: heating, heat recovery: plate heat exchanger), approx. 2,050 m² rectangular ventilation duct, approx. 660 m spiral-seam duct from nominal diameter 80 to nominal diameter 500, approx. 75 plate valves, 2 fire protection plate valves, approx. 25 duct grilles, approx. 190 m² mineral wool thermal insulation, approx. 220 m² synthetic rubber thermal insulation with sheet metal casing, 43 rectangular fire dampers, 32 round fire dampers, 2 air-cooled chillers (99 kW, R32), 2 collection trays including glycol sensors, 1 buffer tank (1,500 l), 1 heat exchanger (99 kW), 7 circulation pumps, approx. 900 m stainless steel piping up to nominal diameter 100, 18 recirculating air coolers, installation of 23 control valves (provided by the client), approx. 130 m flexible elastomer foam insulation up to nominal diameter 100, approx. 160 m foam glass insulation up to nominal diameter 100, 72 fire protection pipe penetrations fire resistance class R90 up to nominal diameter 100, approx. 140 core drillings.
CONTRACTING AUTHORITY
Name
Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Zentrale, Zentralstelle Vergabe- und Vertragsmanagement
City
Dresden
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45331000, Heating, ventilation and air-conditioning installation work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
allowed
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
32 days remaining(LOT-0000)
Published