Installation of Central Heating Systems for New Library HS MW
Installation of central heating systems: 5 pumps, 2 plate heat exchangers for concrete core tempering (heating/cooling approx. 83/103 kW), 1 spray tube vacuum degasser, 2 distributors/collectors, approx. 1,754 m heating water pipelines made of steel including fittings, approx. 360 m heating water pipelines made of multi-layer composite pipe including fittings, approx. 1,364 m chilled water pipelines made of steel including fittings and corrosion protection, approx. 700 valves, strainers and pipe installations, approx. 2,074 m thermal insulation on pipelines, approx. 1,364 m cold insulation on pipelines, approx. 252 transfer systems (underfloor convectors, radiators, door air curtains, recirculating air units), 16 heating circuit distributors for concrete core tempering.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 593631-2026HTML
- TED PDF — 593631-2026PDF
- TED XML — 593631-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.