Intensification of Water Supply Pipeline Viničky - Kráľovský Chlmec, 2nd Stage
Reconstruction of a water supply pipeline: 1,672 m of supply pipeline between Viničky and Ladmovce, on the right bank of the Bodrog river, outside built-up areas. The main section comprises 1,645 m of ductile iron DN 500 (PN10); at the Bodrog dam crossing, a 27 m long HDPE pipe DN/OD 450 x 26.7 (PN10) will be inserted into an existing DN 500 pipe, including sealing and anchoring. Installation will be in an open trench, adhering to standard clearances, with pressure tests, flushing, disinfection, and restoration of affected areas to their original condition. Construction is planned in stages to ensure continuity of supply for the Kráľovský Chlmec agglomeration.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 564818-2026HTML
- TED PDF — 564818-2026PDF
- TED XML — 564818-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.