Sewer Construction: Zemmer Wastewater Group Connecting Collector
Construction of a new 1,500m connecting sewer collector between Schleidweiler and Mühlenflürchen to relieve the wastewater treatment plant. The construction period is a maximum of 120 working days.
CONTRACTING AUTHORITY
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45000000 – Construction work.
Other CPV
45232410 – Sewerage work.
45231300 – Construction work for water and sewage pipelines.