Consolidation of Potable Water Infrastructure between Cirkewwa RO and Ta’ Qali Reservoir, Wied Musa
Laying of pipes by open cut trenches: Installation of potable water ductile iron mains 150mm, 350mm, and 600mm between Cirkewwa Reverse Osmosis and Ta’ Qali Reservoir, specifically in Wied Musa. All ductile iron mains and fittings, all polyethylene pipes and fittings, and manhole covers and surface boxes are to be supplied by the Water Services Corporation.
CONTRACTING AUTHORITY
Name
Water Services Corporation
City
Luqa
Country
MT
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45112000, Excavating and earthmoving work.
Other CPV
45231300, Construction work for water and sewage pipelines.
44161000, Pipelines.
ADDITIONAL DETAILS
EU Funded
Yes
Electronic Submission
Required
Legal Basis
32014L0025
DEADLINES & TIMELINE
Submission Deadline
32 days remaining(LOT-0001)
Published