Supply, Installation, Legalization, Integration, and Commissioning of 9 Charging Points for Electric Buses
Supply, installation, legalization, integration into the current management system, and commissioning of 9 charging points and associated fire protection systems for electric buses: Each charging point includes the supply and installation of the charger, a pantograph, a dispenser, fastening elements or structures, cabling, communications, control systems, and the integration of the charging point into the current Smart-Charging system and the already installed back-up system (SCADA). License costs for the use and maintenance of the Smart-Charging system and the SCADA system are included for the duration of the charger warranty. Associated fire protection systems consist of: containment barriers or curtains, cabling, thermal cameras, as well as auxiliary elements for installation and commissioning, including integration into the current alarm center specific to the vehicle charging installation. The contract includes the entire legalization process for all charging points with the necessary entities, including fees or associated costs, the required license(s) for the installation and commissioning with the Gijón City Council and the industry of the Principality of Asturias, as well as OCAS, as required for legal procedures. Warranty and maintenance are also included in the contract.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 560956-2026HTML
- TED PDF — 560956-2026PDF
- TED XML — 560956-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.