Skip to main content
Activeted-497043-2026

Supply of irrigation water for EPEL BALTEN, including groundwater, regenerated, and desalinated water

Supply of irrigation water for EPEL BALTEN: includes subterranean water, regenerated (reused) water, and desalinated water.

CONTRACTING AUTHORITY

Name

Consejo de Administración de la Entidad Pública Empresarial Local Balsas de Tenerife, BALTEN del Cabildo Insular de Tenerife

City

Santa Cruz de Tenerife

Country

ES

CLASSIFICATION

Procedure Type

Restricted Procedure

Contract Type

Supplies

Main CPV

41120000, Non-drinking water.

Other CPV

41000000, Collected and purified water.

41100000, Natural water.

ADDITIONAL DETAILS

EU Funded

Yes

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

31 days remaining

(LOT-0000)

Published

TENDER DOCUMENTS

31 days remaining

Similar Tenders

Explore CPV 41
€1.8M

Water purification and transport container

Delivery of water purification and transport containers: 3 units for use as mobile water supply support points for distributing purified water to other water transport vehicles and as self-sufficient units for water purification for troops. An option includes 3 units for 2027 (redemption by 31.12.2027) and 3 units for 2028 (redemption by 31.12.2028), with options redeemable fully or partially at the client's discretion. Field testing will be conducted for the first container to ensure compliance.

Puolustusvoimien logistiikkalaitos

·Tampere
Deadline:September 11, 2026

Desalinated Drinking Water for Naxos

Supply of desalinated drinking water: minimum quantity 2,000 m³ per day.

ΔΗΜΟΣ ΝΑΞΟΥ ΚΑΙ ΜΙΚΡΩΝ ΚΥΚΛΑΔΩΝ

·ΝΑΞΟΣ
Deadline:August 03, 2026
€1.1M

Concession for the Drinking Water Supply of the Municipality of Saint-Ay

Operation of the drinking water supply service: Contract duration 8 years from January 1, 2027.

Ville de Saint-Ay

·Saint-Ay
Deadline:September 02, 2026

Chemical P-precipitation for Wastewater Treatment

Technical equipment and construction work for the chemical phosphate precipitation of the Schuttern wastewater treatment plant. The measure includes the construction of a precipitant dosing system, the construction of a pipe bridge made of hot-dip galvanized steel, and associated construction and repair work at the phosphate precipitation station. The main works include earthworks, formwork, concrete and reinforced concrete work for foundations, as well as the complete I&C technology. The trade of technical equipment and pipeline construction dominates the project.

Gemeinde Friesenheim - Abwasserverband Friesenheim

·Friesenheim
Deadline:August 17, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now