Skip to main content
Activeted-535568-2026

Supply of 350 MVA Power Autotransformers for SEPS Projects

Supply of 7 units of 400/110/33kV power autotransformers with complete accessories: manufacturing, transport, unloading, placement, on-site installation, related completion, and performance of necessary chief fitter work at the respective substations (ESt). This includes: 2 units of three-phase, three-winding, oil-regulated autotransformers for outdoor use, 350 MVA, for ESt Ladce; 1 unit for ESt Križovany; 1 unit for ESt Šurany; 2 units for ESt Liptovská Mara; 1 unit for ESt Rimavská Sobota or ESt Horná Ždaňa, with the client reserving the right to specify the delivery location for this transformer. Further details are provided in the contract documents, Annex 2 (Technical Specifications), Annex 3 (Bill of Quantities), and Annex 8 (Binding Documents).

CONTRACTING AUTHORITY

Name

Slovenská elektrizačná prenosová sústava, a.s.

City

Bratislava

Country

SK

CLASSIFICATION

Procedure Type

Restricted Procedure

Contract Type

Supplies

Main CPV

31170000, Transformers.

Other CPV

51111300, Installation services of transformers.

45317200, Electrical installation work of transformers.

71320000, Engineering design services.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

Yes

Electronic Submission

Required

Legal Basis

32014L0025

28 days remaining

Similar Tenders

Explore CPV 31
€437,215

Engineering and Project Services for the Renewal of 110kV and 400kV Secondary Technology, ROP 110kV and RIS 400 kV at Horná Ždaňa Substation

Project and engineering services for the renewal of 110kV and 400kV secondary technology, ROP 110kV, and RIS 400 kV innovation at Horná Ždaňa Substation: Provision of input documents according to point 3.3.1 of the UNIKA 2026 Tariff for pricing project and engineering services, development of the project structure including a list of PS and SO, preparation of project documents for the selection of the construction contractor (Construction Project -1), development of a draft implementation schedule (HMG) considering the annual shutdown plan, development of Construction Project -2 based on Construction Project -1 and the offer of the successful bidder, preparation of the as-built documentation (DSV) approved by the client, ensuring professional author's supervision by the designer, participation in the commissioning of the work or parts thereof, and participation in the trial operation, development of a fire safety solution project for the entire substation in accordance with § 4 and 9 of Act No. 314/2001 Z. z. on fire protection, development of an occupational health and safety plan and its adjustments during the preparation and implementation of the construction in accordance with NV SR No. 396/2006 Z. z. on minimum safety and health requirements for construction sites, and ensuring the performance of the project documentation coordinator. The technical description of the subject of the contract is included in the excerpt from investment requirement No. 5120/2024/2 (Annex No. 2 to the Contract for the Execution of the Work), which includes PNI No. 2120/2022/11 "Renewal of secondary technology ESt Horná Ždaňa and innovation RIS 400 kV" and PNI No. 2120/2023/01 "Renewal of secondary technology R110kV and ROP 110 kV ESt Horná Ždaňa".

Slovenská elektrizačná prenosová sústava, a.s.

·Bratislava
Deadline:September 10, 2026
€32M

Power line construction for Levice substation

We are seeking an experienced partner for the construction and dismantling of 400 kV power lines and the installation of fiber optic cables at the Levice substation. The work is scheduled for 2028 and requires precise execution timelines.

Slovenská elektrizačná prenosová sústava, a.s.

·Bratislava
Deadline:August 04, 2026

Material Supply for Medium Voltage Grids

Medium voltage cables and accessories: approx. 8,445 m of 10 kV medium voltage cable, approx. 78 units of 10 kV connection sleeves and plug-in terminations.

Stadtwerke Warendorf GmbH

·Warendorf
Deadline:August 14, 2026

Construction of a 940-space Park-and-Ride Facility

Construction of a 940-space park-and-ride facility: includes earthworks, drainage, deep foundations, structural shell, site preparation, demolition, roadworks, various networks, stormwater management, timber and metal framing, waterproofing, facades, locksmith work, painting, hard flooring, plastering, carpentry, parking signage, electrical installations (power and low current, fire alarm systems), photovoltaic panels, heating, ventilation, air conditioning, plumbing, fire protection, elevators, and landscaping.

COEUR ESSONNE AGGLOMERATION

·Sainte Geneviève des Bois cedex
Deadline:October 15, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now