Ventilation and Air Conditioning Components
Supply and installation of ventilation and air conditioning components: one WRG unit as an RLT device (approx. 3,600 m³/h) with accessories and KVS heat exchanger, one hydraulic station for KVS system, three climate cabinets with air treatment stages heating, cooling, humidifying, dehumidifying (approx. 3,600 m³/h or 2,600 m³/h and 1,200 m³/h), approx. 880 m² ducts and fittings including insulation, approx. 150 m spiral-seam ducts including insulation, approx. 40 m flexible air ducts including insulation, eight ceiling diffusers with H13 filter stage, approx. 18 ceiling swirl diffusers, approx. five disc valves, approx. twelve fire dampers, two outdoor air towers in stainless steel design, one provisional exhaust air tower with grille, and approx. 25 m² dismantling and reassembly of existing insulated ventilation duct.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Restricted — LOT-0001RESTRICTED-DOCUMENT
- TED HTML — 639644-2026HTML
- TED PDF — 639644-2026PDF
- TED XML — 639644-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.