Ventilation systems for Neubach Triple Sports Hall, Teaching Pool, Central Canteen, and Library
Ventilation systems: Mechanical ventilation and exhaust for the building with a total of 4 air handling units (AHU), including an AHU for the canteen/library (approx. 14,000 m³/h, with indirect, adiabatic supply air cooling), an AHU for the kitchen/dishwashing area (approx. 17,000 m³/h, with indirect, adiabatic supply air cooling), an AHU for the sports hall (approx. 14,000 m³/h, without cooling), and an AHU for the swimming pool (approx. 10,000 m³/h). The scope also includes 2,400 m² of square air ducts with thermal insulation, 775 m of spiral-seam ducts with fittings and thermal insulation, 33 fire dampers, 65 variable volume flow controllers, 1 air duct reheater, 1 louvered hood for outdoor air intake, 253 ventilation grilles, disc valves, and slot diffusers, 1 Ansul fire suppression system, 140 m² of kitchen ventilation ceiling, 1 initial hygiene inspection, and 1 maintenance contract for 5 years.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 507270-2026HTML
- TED PDF — 507270-2026PDF
- TED XML — 507270-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.