Ventilation systems for new nursing buildings BT C + D, kbo-Inn-Salzach-Klinikum
Installation of ventilation systems for nursing buildings BT C and BT D of the kbo-Inn-Salzach-Klinikum: For building section C, 3 ventilation units as partial air conditioning systems up to 23,600 m³/h for indoor installation, 2 duct fans up to 160 m³/h for indoor installation, 2 duct fans up to 600 m³/h for outdoor installation, 4,700 m² air ducts with fittings, 3,200 m air lines, 5,400 fittings for air lines, 630 air outlets, 205 fire dampers, 650 silencers, 560 constant volume flow controllers, 170 cold smoke barriers, and 2 louver towers are planned. For building section D, 2 ventilation units as partial air conditioning systems up to 23,600 m³/h for indoor installation, 2 duct fans up to 160 m³/h for indoor installation, 2 duct fans up to 600 m³/h for outdoor installation, 3,500 m² air ducts with fittings, 2,600 m air lines, 4,100 fittings for air lines, 510 air outlets, 180 fire dampers, 500 silencers, 420 constant volume flow controllers, 170 cold smoke barriers, and 2 louver towers are planned.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 566941-2026HTML
- TED PDF — 566941-2026PDF
- TED XML — 566941-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.