Ventilation systems for new construction of sports hall Oberschule Falkensee
Ventilation systems: 2 units RLT supply/exhaust air units with heat recovery (outdoor installation), 1 unit split air conditioning set for IT area, 1 unit decentralized ventilation unit with heat recovery, 43 m² ventilation ceiling for commercial kitchen (CrNi system ceiling modules, splash-proof), approx. 115 m² air ducts and fittings made of stainless steel (gas-shielded welded, for kitchen exhaust air), approx. 816 m² rectangular air ducts and fittings made of galvanized steel (folded), approx. 62 m² cladding/fire protection casing for ducts, approx. 189 m round ducts made of galvanized steel (DN80-DN315), approx. 400 units round fittings and connecting parts (bends, branches, transitions, sleeves, inspection pieces), approx. 119 m flexible round ducts made of aluminum (DN80-DN250), 7 units F90 fire dampers (incl. cover plates), approx. 32 units volume flow controllers (round and angular), approx. 38 units silencers (round and rectangular), approx. 130 units air outlets and grilles incl. connection boxes/mounting frames (for workshops, canteen, sanitary facilities), 4 units weather protection grilles, 6 units roof penetrations/hoods; also insulation: approx. 360 m² thermal insulation made of mineral wool (20-50 mm thickness), approx. 185 m² sheet metal casing.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 596646-2026HTML
- TED PDF — 596646-2026PDF
- TED XML — 596646-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.