Plaster and ETICS Works for Balcony Side Zuschka 25-39 Scaffolding works: approximately 1,400 m² facade scaffolding with scaffolding enclosure, 1 piece scaffolding staircase. Demolition works: 36 m² External Thermal Insulation Composite System (ETICS), 53 m cover profile, 104 m downpipe, 9 pieces advertising signs, 127 pieces aluminum window sills. Waste disposal. Substrate preparation: approximately 930 m² wet sandblasting, approximately 140 m exposing breakouts. Corrosion protection and reprofiling of balconies. Balcony surface treatment: 788 m² equalization, color coating. Balcony floor coating: 161 m² polyurethane (PUR) balcony coating. Preparation: 426 m² re-adhering ETICS, 850 m² doweling ETICS insulation boards, 1,350 m² checking substrate. Window sills: 30 pieces natural stone exterior window sills, 117 pieces aluminum window sills. Plaster base preparation: 1,350 m² cleaning, 971 pieces top coat repair, 572 pieces reinforcement repair. Profiles and edges: 528 pieces diagonal reinforcement, 592 m ETICS edge profile, 592 connecting ETICS to windows, 141 m plinth termination. Plaster and thermal insulation facades: 787 m² mineral wool (MW) insulation layer, 474 m MW insulation layer reveal, 787 m² reinforcement plaster, 787 m² silicate exterior plaster. Plaster and thermal insulation plinth: 197 m² perimeter insulation. Roof works: 61 m² removing blisters/folds, roof waterproofing, 61 m roof edge profile. Coatings: 787 m² initial wall coating, 608 m² initial plinth coating. Balcony roofs and further items as per the tender documents.
Gebäudewirtschaft Cottbus GmbH
· Cottbus