Modernization of Ligota Traction Substation with Technical Infrastructure Construction (Design & Build)
Adaptation of the Ligota traction substation building and construction of necessary technical infrastructure under a design-and-build contract. The project is linked to the construction of railway line No. 139 Katowice – Zwardoń from km 0.000 to km 7.624 and railway line No. 656 from km 0.000 to km 7.092. The scope includes the preparation of formal and technical documentation, including the executive project, execution of works, supply of materials, and conducting all required acceptances and tests for commissioning and handover of the traction substation. The contractor must utilize documentation and decisions provided by the client; certain works will be performed by the client themselves. Detailed description in Attachment 1 to SWZ – Functional-Utility Program.
CONTRACTING AUTHORITY
Name
PGE Energetyka Kolejowa Operator sp. z o. o.
City
Warszawa
Country
PL
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45000000, Construction work.
Other CPV
45100000, Site preparation work.
51100000, Installation services of electrical and mechanical equipment.
51900000, Installation services of guidance and control systems.
65300000, Electricity distribution and related services.
71200000, Architectural and related services.
71000000, Architectural, construction, engineering and inspection services.
71300000, Engineering services.
ADDITIONAL DETAILS
EU Funded
Yes
Electronic Submission
Required
Legal Basis
32014L0025
DEADLINES & TIMELINE
Submission Deadline
35 days remaining(LOT-0001)
Published