Modernization of Gdańsk I Substation: AT3 Replacement and 400 kV Line Adaptation
Modernization of the SE Gdańsk I substation through the replacement of auto-transformer AT3. The project also includes the expansion of the 400 kV Gdańsk Przyjaźń substation, the 400(220)/110 kV Żydowo Kierzkowo substation with the installation of reactive power compensation devices, and the adaptation of the 400/220/110 kV Gdańsk I substation for switching the 400 kV line sections Dunowo – Żydowo Kierzkowo – Gdańsk I and Piła Krzewina – Żydowo Kierzkowo to 400 kV voltage. A supervision option is included. Equivalent solutions to the described technical specifications are permissible. EU co-financing is currently not available but is not excluded for the future.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 547025-2026HTML
- TED PDF — 547025-2026PDF
- TED XML — 547025-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.