Construction of Wastewater Pumping Station and Storage Sewer in Barchfeld-Immelborn
Construction services for the new build of a wastewater pumping station (APW) and a storage sewer (SKU) in the 2nd construction phase in Barchfeld-Immelborn: general services, dewatering measures and flood protection measures, construction of a combined wastewater pumping station/storage overflow structure including earthworks, sheet piling, concrete works, equipment, and surface works, replacement new build of a storage overflow structure including earthworks, sheet piling, concrete works, equipment, and surface works, demolition of existing pumping station and overflow structures including equipment, pipeline installations including earthworks, shoring works, and surface works. This includes 65 m wastewater pressure pipeline (AWDL) DA 180 PE-HD, 53 m relief pipeline DN 1,026*17 mm GFK and pressure pipeline (DL) DA 90 PE-HD with discharge point and trench profiling of approx. 250 m, 158 m storage sewer DN/DP 1,200 SB, 145 m drinking water pipeline up to DA 90 PE-HD, 216 m sewage collector DN 200, and 20 m railway embankment underpass DN 600 steel protection pipe.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- No IDRESTRICTED-DOCUMENT
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.