New construction of Bridge K 227, Section 3, Sub-structure 2
New construction of Bridge K 227, Section 3, Sub-structure 2: Erection of the last eastern central sub-structure (sub-structure 2 of 4) in construction section III within the traffic area of the existing A3 motorway. Sub-structure 2 carries the eastern main carriageway towards Passau over a district road. Main dimensions: reinforced concrete frame with clear span (LW) 12 m and support width (StW) 13.7 m. Services include demolition of the existing structure, earth excavation of 6,500 m³, shoring work, deep foundation with bored piles, and asphalt work on the A3 and the district road.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 622358-2026HTML
- TED PDF — 622358-2026PDF
- TED XML — 622358-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.