Construction of a Drinking Water Treatment Plant for Ludwigsfelde Waterworks
Mechanical and technical equipment (MTA) for a waterworks building: 6 pressure filter vessels for iron and manganese removal, 2 control air compressor systems (100% oil-free compression due to design), 1 backwash pump system, 2 rotary lobe blowers for oil-free purge air delivery, 3 dynamic air mixers for raw water aeration, 1 oxidation air dosing unit, 2 compressed air compressor systems, 2 pure water pumps (flow rate 50–150 m³/h), 2 air filter systems (maximum 250 m³/h per air filter), approx. 556 m building-installed stainless steel pressure pipelines (purified water) from DN 15 to DN 300, approx. 137 m building-installed stainless steel pipelines (contaminated water) from DN 50 to DN 300, and approx. 228 m stainless steel air pipelines for dynamic air mixing from DN 10 to DN 150.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 586842-2026HTML
- TED PDF — 586842-2026PDF
- TED XML — 586842-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.