Construction of Storage Sewer, Retention Soil Filter, and Connecting Collector for Abwassergruppe Zemmer
Construction of a storage sewer, a retention soil filter, and a connecting collector between Rodt and Schleidweiler. This includes the civil engineering part with the demolition of a storm overflow structure, construction of the connecting collector (approx. 375 m length, 20 m height), and the structures for the storage sewer and retention soil filter on parcel 27/1, cadastral map 25, as well as the mechanical and electrical engineering part for the storage sewer and retention soil filter. Construction start no later than 15 working days after receipt of the order letter.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 590264-2026HTML
- TED PDF — 590264-2026PDF
- TED XML — 590264-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.
Lots (2)
- LOT-0001Bautechnik für Stauraumkanal, Retentionsbodenfilter und Verbindungssammler in Rodt
- LOT-0002Elektro- und Maschinentechnik für Stauraumkanal und Retentionsbodenfilter in Rodt