Overhead Line Installation, Maintenance, Pile Foundation, and Mast Setting Device
Overhead line maintenance: on existing routes nationwide in Austria for overhead line systems up to 250 km/h, while maintaining railway operations. Overhead line installation: on new and existing routes nationwide in Austria for overhead line systems up to 120 km/h; on existing routes while maintaining railway operations. Overhead line installation: as described previously, but for speeds up to 250 km/h. Mast setting device: for manipulating, setting, and pulling overhead line reinforced concrete and steel masts on new and existing routes nationwide in Austria. Pile foundations and groundwork: using impact ramming or an alternative approved method (as per C2) for reinforced concrete overhead line masts (including narrow special steel masts with concrete bases) and other overhead line masts on new and existing routes nationwide in Austria. Pile foundations and groundwork (alternative methods): using impact ramming or an alternative approved method (as per C2) for reinforced concrete overhead line masts (including narrow special steel masts with concrete bases) and other overhead line masts on new and existing routes nationwide in Austria.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 539940-2026HTML
- TED PDF — 539940-2026PDF
- TED XML — 539940-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.