Design and Construction of ERTMS/ETCS Level 2 Systems for Railway Lines No. 133 and 134 (Sosnowiec Jęzor – Kraków Główny)
Design and Construction of ERTMS/ETCS Level 2 Systems for Railway Lines No. 133 and 134 (Sosnowiec Jęzor – Kraków Główny): Creation of preliminary documentation (design concept, data preparation rules, operational scenarios, railway traffic rules update Ir-1b, test cases), project documentation for all construction works, technical and operational documentation according to Ie-100a, as-built documentation including geodetic survey, execution of all construction and preparatory works, conformity assessment of the "Control – trackside equipment" structural subsystem, and obtaining the operational permit. The implementation period is 29 months from contract signing, including 20 months for completion of works, submission of as-built documentation and certification documents, and 29 months for obtaining operational permits and final acceptance. Optional services include extending the scope to railway line No. 134 (Jaworzno Szczakowa – Mysłowice from km 0.220 to km 6.624) and railway line No. 133 (Dąbrowa Górnicza Ząbkowice – Kraków Główny from km 14.925 to km 20.740), to be executed within 18 months of activation, and changes to installed ERTMS/ETCS Level 2 devices to ensure RBC – RBC Handover function with ETCS Level 2 devices on adjacent lines, to be executed within 4 months of activation. Services cover railway traffic control (srk), telecommunications, and electrical engineering; further items as per the tender documents.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 560928-2026HTML
- TED PDF — 560928-2026PDF
- TED XML — 560928-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.