Planning services for new construction of a mixed water treatment plant and a wastewater pumping station in the city center catchment area
Planning services for the new construction of a mixed water treatment plant and a wastewater pumping station: object planning for engineering structures, open spaces, and traffic facilities; architectural plant design consulting; structural engineering; technical equipment; planning and supervision of site clearance and demolition works; simulations; pollutant load calculation; fire protection consulting; explosion protection concept; services related to occupational safety; consulting services by an AwSV expert; value engineering/value days; creation of functional instructions/switching points for control; personnel deployment concept for plant operation. The implementation of the measure is scheduled: service phase 1-5 from 01.02.2027 to 01.01.2029, service phase 6-7 from 02.01.2029 to 01.10.2029, service phase 8 from 03.02.2029 to 31.12.2032, service phase 9 from 01.01.2033 to 31.12.2036. The contract is awarded in two stages: Stage 1 covers service phases 1 to 4, Stage 2 covers service phases 5 to 9. The commissioning of Stage 2 is linked to the satisfactory execution of Stage 1, the availability of financial resources, internal administrative decisions, and the approval of the relevant political bodies of the City of Münster.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 567782-2026HTML
- TED PDF — 567782-2026PDF
- TED XML — 567782-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.