Planning Services for New Fire Station Flachsmeer
Architectural design for buildings: service phase (Lph) 4, optional Lph 5-9 according to § 34 HOAI in conjunction with Annex 10, Section 10.1. Architectural design for outdoor facilities: Lph 1-4, optional Lph 5-9 according to § 39 HOAI in conjunction with Annex 11, Section 11.1. Structural engineering: Lph 1-4, optional Lph 5-6 according to § 51 HOAI in conjunction with Annex 14, Section 14.1. Technical equipment: Lph 1-4, optional Lph 5-9 according to § 55 HOAI in conjunction with Annex 15, Section 15.1 for wastewater, water and gas systems, heating systems, ventilation systems, power supply systems, telecommunications or information technology systems, conveying systems, use-specific systems, and building automation. Fire protection: Lph 1-4, optional Lph 5 and 8 according to AHO publication series No. 17 (2022). Safety and health coordination (SiGeKo): during planning, optional during execution. Energy efficiency experts for non-residential buildings according to the directory of energy efficiency experts for federal funding programs.
Missed this tender?
This deadline has passed. So it does not happen again: we send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 510940-2026HTML
- TED PDF — 510940-2026PDF
- TED XML — 510940-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.