Skip to main content
Activeted-503129-2026

Planning Services for Rehabilitation and Extension of the Nemours Media Library

Planning services for the rehabilitation and extension of the Nemours Media Library: The competition covers new construction and rehabilitation of the existing library, housed in an 18th-century building. The project includes rehabilitation and restructuring of existing buildings, an extension, demolition of existing buildings, and exterior landscaping. New construction comprises 337 m² usable area (approx. 450 m² GFA), and restructuring covers 647 m² usable area (approx. 860 m² GFA) in the current library building and the former town hall building. The total project surface area must not be less than 1,310 m² GFA. The estimated cost of works is 3,200,000 euros excl. VAT (July 2026 value), including services for VRD, construction, specific fixed technical equipment, roadworks, and exterior spaces. Four teams will be selected based on technical, professional, and financial capacities, as well as the quality and relevance of references, including 3 illustrated references from the lead architect.

CONTRACTING AUTHORITY

Name

VILLE DE NEMOURS

City

NEMOURS CEDEX

Country

FR

CLASSIFICATION

Procedure Type

Restricted Procedure

Contract Type

Services

Main CPV

71200000, Architectural and related services.

Other CPV

71240000, Architectural, engineering and planning services.

71300000, Engineering services.

77310000, Planting and maintenance services of green areas.

ADDITIONAL DETAILS

EU Funded

Yes

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

65 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

65 days remaining

Similar Tenders

Explore CPV 71

Expertise for Technical Projects of Roads and Engineering Structures

Expertise for technical, technical work, and work projects of state roads (main, regional, district roads), other road structures, road elements, and engineering structures on road plots: Performance of general and partial expertises.

AB Via Lietuva (PV)

·Vilnius
Deadline:August 20, 2026

Planning Services for the Rehabilitation of the Former Ronzon Tanneries into a Cultural Hub

Planning services for the rehabilitation of the former Ronzon tanneries into a cultural hub: The construction project involves the rehabilitation or reuse of a building; services are divided into tranches according to Articles R.2113-4 to R.2113-6 of the Public Procurement Code.

Mairie de Saint Symphorien-sur-Coise

·SAINT SYMPHORIEN SUR COISE
Deadline:September 14, 2026

Development of a Green Corridor Project and Street Design Training in Dakar

Pre-feasibility study for a Green Corridor and training: Preparation of a pre-feasibility study to improve safe pedestrian access to public transport in Keur Massar and strengthening institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. Work Package 1 (Baseline study) includes the review of existing data and studies, identification of gaps, additional data collection (e.g., traffic counts, user surveys, air quality and environmental measurements) as well as the analysis of urban context and land use, travel demand (quantitative and qualitative), supply quality and capacity for all modes, safety and conflicts, environmental quality, climate stress (heat, flooding), gender and social inclusion, institutional and legal framework, and state-of-the-art references (incl. regional examples). Deliverables WP1: D1.1 Methodological orientation (inception) report, D1.2 Baseline report, D1.3 Slide deck, D1.4 Provision of raw, machine-readable and editable data and media. Work Package 2 (Participation process) involves stakeholder mapping (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighborhood groups, local and national authorities), the design and implementation of an inclusive, gender-responsive participation strategy (incl. at least one virtual measure), facilitation of workshops, mediation as needed, and documentation and evaluation of results. Deliverables WP2: D2.1 Stakeholder analysis (report), D2.2 Slides, D2.3 Participation Strategy, D2.4 Facilitation materials/templates (editable), D2.5 Results report with inputs for corridor requirements, D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. Work Package 3 (Pre-feasibility Study (PFS) Green Corridor) covers the identification and appraisal of design/traffic management alternatives, a SWOT analysis, and the recommendation of a preferred alternative in consultation with CETUD and local administrations. Production of approx. 15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shading, materials, signage; capacity for all modes). Conduct of preliminary Environmental and Social Impact Assessment and cultural/heritage screening, Cost-Benefit Analysis incl. climate benefits, risk assessment (strategic/project risks), outlining of financing options and sources. Preparation of an implementation strategy (phasing, data/engineering needs, roles/responsibilities, maintenance concept, financing structure), communication strategy (public and stakeholder messaging, best practice), investor pitch deck. Preparation of an Action Plan on Secure Bus Stops aligned with metropolitan frameworks (topic may be adjusted). Deliverables WP3: D3.1 Alternatives & conceptual designs, D3.2 Preliminary Impact Assessment, D3.3 CBA, D3.4 Risk Assessment, D3.5 PFS, D3.6 Pitch deck, D3.7 Implementation Strategy, D3.8 Communication Strategy, D3.9 Action Plan. Work Package 4 (Training conceptualization and implementation) includes the design and delivery of a 120-hour training (approx. 3 seminars x 3 days + self-learning) on sustainable mobility and street design, public space management and climate resilience, project development from concept to operation; integration of co-creative work on Green Corridor elements. Train-the-trainer: Coaching of 5 staff (CETUD/local authorities) to replicate training, refinement of materials after pilot. Development of replicable materials: presentations, scripts, videos (approx. 240 min), templates (surveys, fieldwork), instructor's manual, implementation plan and guidance (checklists, certificate templates), evaluation tools; final training report with lessons learned. Deliverables WP4: D4.1 Training concept, D4.2 Training materials, D4.3 Instructor's manual, D4.4 Implementation plan & guidance, D4.5 Training report. Governance and cooperation: Close coordination with CETUD, MiTTA and a Technical Committee established by CETUD; alignment with the RTC project context and ongoing bus station redevelopment. Provision of brief monthly status reports (2 pages) in French (activities, outputs in progress, impacts, decisions needed, expert days). Contribution to knowledge sharing (events, publications) and support for evaluation of knowledge management effectiveness. Reporting and languages: Main deliverables in French; the participation toolkit in FR/EN; raw data and media in editable, machine-readable formats as specified. Indicative duration and milestones (from contract start): WP1: D1.1 at 1 month; D1.2-1.4 at 3 months. WP2: D2.1-2.2 at 2 months; D2.3 at 4 months; D2.4 at 6 months; D2.5 at 10 months; D2.6 at 11 months. WP3: Designs drafts at 3/8 months, final at 12 months; Impact/CBA/Risk drafts 6-10 months, finals at 12 months; PFS draft 9 months, final 12 months; Pitch/Implementation/Communication drafts 10 months, finals at 12 months; Action Plan draft 10 months, final 12 months. WP4: Concept draft/final 4/6 months; Materials 6/7 months; Instructor's manual 6/8 months; Implementation plan 8/9 months; Training report 12 months.

Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

·Eschborn
Deadline:August 21, 2026

Technical Equipment Planning Services for Wading Pool Renovation at Gadenstedt Outdoor Pool

Technical equipment planning services for the renovation of the wading pool at Gadenstedt outdoor pool: Demolition of the existing approx. 90 m² square pool with paved surround and new planning of a child-friendly wading pool with a total water surface of approx. 85 m². The new pool will be divided into two areas (water depth 0.4 m to 0.5 m and 0.1 m to 0.3 m), connected by a ramp, and will feature a circulating overflow channel and stainless steel lining. Planned attractions include a children's slide, a floor bubbler, a water cannon, a water mushroom, and a splash animal. The pool surround will be spacious, paved with light-colored paving, and equipped with sunshades, loungers, and climate-resilient planting. Any required building permit will be applied for by the contractor; further items as per the tender documents.

Gemeinde Ilsede

·Ilsede
Deadline:August 24, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now