Design Services (Feasibility Study) for the Construction of a Screening Center in Arad
Design services for the construction of a Screening Center in Arad: preparation of a feasibility study to determine the technical-economic indicators of the investment object. The contract duration is 4 months, divided into Phase 1 (preparation of the feasibility study) with 3 months, Phase 2 (acceptance of the feasibility study by the client) with 15 days, and Phase 3 (implementation of changes requested by the client) with 15 days.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 579231-2026HTML
- TED PDF — 579231-2026PDF
- TED XML — 579231-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.