Plaster and ETICS Works for Balcony Side Zuschka 25-39
Scaffolding works: approximately 1,400 m² facade scaffolding with scaffolding enclosure, 1 piece scaffolding staircase. Demolition works: 36 m² External Thermal Insulation Composite System (ETICS), 53 m cover profile, 104 m downpipe, 9 pieces advertising signs, 127 pieces aluminum window sills. Waste disposal. Substrate preparation: approximately 930 m² wet sandblasting, approximately 140 m exposing breakouts. Corrosion protection and reprofiling of balconies. Balcony surface treatment: 788 m² equalization, color coating. Balcony floor coating: 161 m² polyurethane (PUR) balcony coating. Preparation: 426 m² re-adhering ETICS, 850 m² doweling ETICS insulation boards, 1,350 m² checking substrate. Window sills: 30 pieces natural stone exterior window sills, 117 pieces aluminum window sills. Plaster base preparation: 1,350 m² cleaning, 971 pieces top coat repair, 572 pieces reinforcement repair. Profiles and edges: 528 pieces diagonal reinforcement, 592 m ETICS edge profile, 592 connecting ETICS to windows, 141 m plinth termination. Plaster and thermal insulation facades: 787 m² mineral wool (MW) insulation layer, 474 m MW insulation layer reveal, 787 m² reinforcement plaster, 787 m² silicate exterior plaster. Plaster and thermal insulation plinth: 197 m² perimeter insulation. Roof works: 61 m² removing blisters/folds, roof waterproofing, 61 m roof edge profile. Coatings: 787 m² initial wall coating, 608 m² initial plinth coating. Balcony roofs and further items as per the tender documents.
CONTRACTING AUTHORITY
Name
Gebäudewirtschaft Cottbus GmbH
City
Cottbus
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45443000, Facade work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
29 days remaining(LOT-0001)
Published