Cross-section redesign of L 510 between Ochtrup and Gronau
Road construction works for the cross-section redesign of L 510 between Ochtrup and Gronau, Section 21 (Station 0.000 to 5.415), L 573 Heek/Nienborg - Ochtrup, Section 17/18, and B 54 near Ochtrup, Section 157/158. Services include: Installation of approx. 15 units of tree trunk protection, clearing of approx. 60.00 m² shrubbery and approx. 510.00 m² deforested area, dismantling of approx. 240 guide posts, approx. 110 traffic signs, approx. 420.00 m guardrails, approx. 220.00 m curbstones, approx. 200.00 m concrete stone gutters, approx. 345.00 m² concrete paving, approx. 20.00 m² concrete slab surfacing, approx. 27.00 m² concrete pavement, approx. 20.00 m² grass pavers, dismantling of approx. 5 road drains, excavation of approx. 120.00 m³ building pit, removal of approx. 100.00 m drainage pipes, milling of approx. 48,100.00 m² asphalt, cleaning of approx. 33,000.00 m² sub-base, separation of approx. 5,000.00 m asphalt pavement, removal of approx. 15,360.00 m² asphalt pavement, approx. 315.00 m³ asphalt pavement, approx. 3,720.00 m³ tar-containing pavement, disposal of approx. 8,750.00 t hazardous waste, removal of approx. 14,745.00 m³ unbound layer, removal of approx. 9,850.00 m² shoulder/median strip and approx. 350.00 m³ vegetation layer, delivery and installation of approx. 1,900.00 m³ soil, delivery and covering with approx. 150.00 m³ topsoil and approx. 22,810.00 m² topsoil, installation of approx. 10 road drains, installation of approx. 10 road drain covers, adjustment of approx. 6 road drain covers, delivery and installation of approx. 2 inspection shafts, installation of approx. 2 manhole covers, installation of approx. 110.00 m plastic pipeline DN 150, approx. 75.00 m plastic pipeline DN 400 with earthworks, approx. 100.00 m plastic pipeline DN 600 with earthworks, approx. 25.00 m concrete pipeline DN 700 with earthworks, construction of approx. 130.00 m ditch, approx. 235.00 m trench, approx. 60.00 m³ trench, approx. 85.00 m infiltration trench with earthworks, laying of approx. 13,750.00 m² geotextile as separation layer, installation of approx. 12,330.00 m³ frost protection layer 0/45, approx. 1,980.00 t frost protection layer 0/32, profile-compliant construction of approx. 14,230.00 m² shoulder, installation of approx. 1,960.00 t asphalt base course AC 32 TS, approx. 2,795.00 t asphalt base course AC 22 TS, approx. 290.00 t asphalt base course AC 22 TN, approx. 14,450.00 m² asphalt base course AC 22 TS, approx. 15,310.00 m² asphalt base course AC 22 TN, spraying of approx. 28.30 t bitumen emulsion, installation of approx. 43,900.00 m² asphalt binder course AC 16 BS SG, approx. 43,425.00 m² asphalt concrete AC 11 DS, approx. 14,840.00 m² asphalt concrete AC 8 DN, approx. 150.00 t asphalt concrete AC 11 DS, approx. 130.00 t asphalt concrete AC 8 DN, execution of approx. 44,920.00 m² anti-skid measures, installation of approx. 6.00 t mastic asphalt MA 8 S, approx. 15,560.00 m edge sealing, approx. 7,635.00 m joint formation in bituminous layer, approx. 1,965.00 m connection with joint tape, setting of approx. 675.00 m concrete curbstones, installation of approx. 630.00 m strips of concrete pavers, approx. 575.00 m² concrete block paving, delivery and installation of approx. 245 guide posts, installation of approx. 60.00 m railings, execution of marking and signage works, installation of safety barriers, extension of traffic light system. For L 573 Heek/Nienborg - Ochtrup, Section 17/18: Dismantling of approx. 76 guide posts and approx. 23 traffic signs, removal of approx. 3,110.00 m² shoulder, peeling of approx. 2,420.00 m shoulder, exposing of approx. 2,420.00 m road edge, milling of approx. 25,440.00 m² asphalt, removal of approx. 5,300.00 m² tar-containing pavement, disposal of approx. 550.00 t hazardous waste, delivery and covering with approx. 3,160.00 m² topsoil, installation of approx. 35.00 m³ frost protection layer 0/45, profile-compliant construction of approx. 165.00 m³ shoulder, installation of approx. 110.00 m² asphalt base course AC 22 TN, spraying of approx. 13.50 t bitumen emulsion, installation of approx. 2,550.00 m² asphalt reinforcement glass, installation of approx. 28,200.00 m² asphalt binder course AC 16 BS SG, approx. 28,450.00 m² asphalt concrete AC 11 DS, approx. 28,800.00 m² anti-skid measures, installation of approx. 2,620.00 m edge sealing, approx. 1,940.00 m joint formation in bituminous layer, approx. 2,620.00 m connection with joint tape, delivery and installation of approx. 76 guide posts, execution of marking and signage works. For B 54 near Ochtrup, Section 157/158: Clearing of approx. 700.00 m² shrubbery, removal of approx. 890.00 m² shoulders, separation of approx. 530.00 m asphalt pavement, removal of approx. 35.00 m³ asphalt pavement, dismantling of approx. 520.00 m safety barriers, delivery and covering with approx. 930.00 m² topsoil, installation of approx. 19 road drains, installation of approx. 19 road drain covers, connection with approx. 530.00 m joint tape, installation of approx. 530.00 m concrete block gutters, installation of safety barriers.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 489007-2026HTML
- TED PDF — 489007-2026PDF
- TED XML — 489007-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.