Skip to main content
Activeted-500315-2026

Framework Agreement for Road, Development, and Utility Network Works

Framework agreement for road, development, and utility network works: Covering the needs of the members of the purchasing group, coordinated by Communauté de Communes Falaises du Talou. Duration 12 months, renewable 3 times for 1 year.

CONTRACTING AUTHORITY

Name

COMMUNAUTE DE COMMUNES FALAISES DU TALOU

City

Envermeu

Country

FR

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45233100, Construction work for highways, roads.

Other CPV

45233140, Roadworks.

45233222, Paving and asphalting works.

90611000, Street-cleaning services.

ADDITIONAL DETAILS

EU Funded

Yes

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

22 days remaining

(LOT-0000)

Published

TENDER DOCUMENTS

22 days remaining

Similar Tenders

Explore CPV 45

On-demand transport service for the Communauté de Communes Falaises du Talou

Operation of an on-demand transport service: in the territory of the Communauté de Communes Falaises du Talou; initial duration 12 months, tacitly renewable up to 3 times (maximum duration 4 years).

COMMUNAUTE DE COMMUNES FALAISES DU TALOU

·Envermeu
Deadline:August 28, 2026

Final Road Construction for In de Brinke Development Area, Section 1

Final road construction in the In de Brinke development area, section 1: Demolition of existing asphalt roads, construction of roadways and sidewalks using asphalt and paving, adaptation and supplementation of road drainage, creation of tree pits, and preparation of green spaces. Remaining services include street lighting and individual utility installations. Site access is exclusively via Stadtstraße Nord. Work takes place in a residential area, maintaining accessibility for residents, pedestrians, and cyclists.

Stadt Warendorf, Der Bürgermeister, Bauverwaltungsamt, Zentrale Vergabestelle

·Warendorf
Deadline:August 27, 2026

Renovation of pool technical systems for Burgsinn outdoor pool

Pool water technology: Supply and installation of PVC-U fittings, core drilling in the existing technical building, pool piping, supply and installation of raw water pumps with associated fittings, expansion and adaptation of the existing control cabinet, integration of the existing measurement, control, regulation, dosing, and disinfection technology.

Markt Burgsinn

·Burgsinn
Deadline:August 26, 2026

Pavement Rehabilitation for A42, Bochum Interchange

Asphalt works and traffic safety for pavement rehabilitation: approx. 165,500 m² asphalt binder course of AC 16 B SG, approx. 165,500 m² asphalt surface course of SMA 8 S, approx. 24 units of traffic safety measures, approx. 35,000 m various marking works, approx. 11 units of induction loops to be restored.

Die Autobahn GmbH des Bundes - NL Westfalen

·Hamm
Deadline:August 25, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now