Framework Agreement for Control Tests, Preliminary and Constructional Investigations (Open-House Procedure)
Framework agreement for control tests, preliminary and constructional investigations: Conclusion of a non-exclusive framework agreement via an Open-House procedure for the service areas Soils and Soil Improvements (LB 01), Unbound Layers and Building Material Mixtures (LB 02), Hydraulically Stabilized Base Layers (HVT), Hydraulically Bound Base Layers (HGT) and Soil Stabilizations (LB 03), Concrete according to ZTV Concrete (LB 04), Structural Engineering (LB 05), Asphalt Constructions (LB 06, incl. Performance Tests), Bitumen Investigations (LB 07), Joint Fillers (LB 08), Surface Properties (LB 09, incl. evenness measurements tactile/non-tactile, skid resistance measurements SKM/SRT, texture measurements), Road Markings (LB 10), Preliminary Investigations (LB 11, for asphalt, base layers with hydraulic binders and concrete pavements, unbound layers, soils, structural engineering), Environmental Analytics (LB 12), and Sampling for Environmental Analytics (LB 13). The Open-House procedure runs from publication until July 31, 2028, with two extension options of 1 year each, until July 31, 2030. Admission applications and contract conclusions are possible throughout the entire duration. The Southern Bavaria branch will call off services starting from April 2, 2027.
CONTRACTING AUTHORITY
Name
Die Autobahn GmbH des Bundes - NL Südwest
City
Stuttgart
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Services
Main CPV
71900000, Laboratory services.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
allowed
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
736 days remaining(LOT-0000)
Published