Ventilation and Air Conditioning Systems for Construction Phase 2C+D
Ventilation and air conditioning systems: 1x supply/exhaust air system according to DIN1946, T4 including KV-WRG with 5,300 m³/h for the MVZ area ground floor south side; 1x supply/exhaust air system according to DIN1946, T4 including KV-WRG with 15,000 m³/h for the ZNA/X-ray/MRI area ground floor south side; 1x supply/exhaust air system including rotor heat recovery with 4,500 m³/h for the technical area basement 1 south side; 1x supply/exhaust air system according to DIN1946, T4 including KV-WRG with 5,000 m³/h for the Decision Unit / Radiology area ground floor north-east side; 1 unit outdoor air tower 1.6 x 4.5 m up to 22,000 m³/h; approx. 200 units components such as fire dampers (BSK) and volume flow controllers (VSR), electrical and mechanical; HVAC distribution network with approx. 3,000 m² HVAC ducts and approx. 1,000 linear meters spiral-seam pipes including thermal insulation; smoke extraction system with approx. 10,000 m³/h with axial fan, F-90 duct and suction hoses DN450; dismantling and disposal of 1x operating room supply air ceiling approx. 3 x 3m, ventilation lines, components and insulation on the ground floor.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 598627-2026HTML
- TED PDF — 598627-2026PDF
- TED XML — 598627-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.