Realization of Master Plan for Rijkskantoor Westraven in Utrecht
Phased realization and coordination of the entire work as general contractor: The Rijkskantoor Westraven currently comprises approximately 53,700 m² gross floor area (GFA), increasing to approximately 55,000 m² GFA after completion. The building structure includes a high-rise with 23 floors (excluding basement and roof structure) and a low-rise with 5 wings, each with 4 floors (excluding roof structure). Services cover construction costs, interior construction, mechanical engineering, structural engineering, building physics, circularity, indoor garden landscaping, sustainability, security, fire safety, construction, installation technology (electrical and ICT), quality assurance, system engineering, safety & health, and climate technology. During the works, maintenance of operational parts of the complex remains with contracted maintenance contractors; coordination is required for temporary situations, partial commissioning, and the impact of extensive works.
CONTRACTING AUTHORITY
Name
Rijksvastgoedbedrijf
City
Den Haag
Country
NL
CLASSIFICATION
Procedure Type
Restricted Procedure
Contract Type
Works
Main CPV
45000000, Construction work.
Other CPV
35120000, Surveillance and security systems and devices.
42500000, Cooling and ventilation equipment.
45212500, Kitchen or restaurant conversion.
45300000, Building installation work.
45451300, Interior gardens.
71540000, Construction management services.
ADDITIONAL DETAILS
EU Funded
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
52 days remaining(LOT-0000)
Published