Reconstruction of the Táboritská – Seifertova Tram Line

Status
Active
Submission Deadline
20 days remaining
Contracting authority
Dopravní podnik hl. m. Prahy, akciová společnost12 more open tenders view
Location
Praha - Vysočany, Czechia
Estimated Value
CZK 807,120,295
Procedure
Open Procedure · Works
Category
Tramway works.Tramway platforms construction work.Tramline construction works.
Published
Reference
ted-549925-2026

Reconstruction of a tram line with a length of 2.447 km in the streets Táboritská, Seifertova, and Jičínská: The existing tram track on large-panel slabs in Seifertova and Táboritská streets will be replaced by a concrete slab structure with W-tram fastening and asphalt surfacing. In Táboritská street, in the section from Ondříčkova street (excluding intersections) to before the intersection with Prokopova street (excluding intersections), the W-tram structure will be covered with a paved surface. In Olšanská street, the track will be connected to the existing track bed with an open superstructure. The existing tram track in Jičínská street on a concrete slab with metro fastening and stone paving will be replaced by a concrete slab structure with W-tram fastening and asphalt surfacing. At the connection point to the existing tram track behind the intersection with Lucemburská street, the tram surface will be made of stone paving. The project includes the construction of all related technologies and equipment, reconstruction of roadways and sidewalks, necessary relocation of utility networks, and other construction modifications according to the project documentation. Also included is the implementation of a cable network from the substation at Kostnické náměstí in individual branches; towards the city center, cables will be routed through Husinecká, Krásova, Seifertova streets up to the junction crossing with Italská street, and from the city center, the implementation will take place in Štítného, Cimburkova, Seifertova, and Táboritská streets. The cable installation will end with connections on the joined cables at the level of ZDS Lupáčova in Táboritská street. The cable route will largely follow the existing route and partly be new. The performance includes the finalization of the construction implementation documentation (RDS) and the as-built documentation (DSPS), as well as all auxiliary and associated activities such as the provision of attestations, tests, revision reports, UTZ protocols, certificates of competence, and other specified documents. Furthermore, cooperation is required in obtaining permits for trial operation and occupancy approval.

Free

Never miss a tender again

We send you 3 current matches that fit your company.

With a number we call briefly to sharpen your search profile.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email and, if you leave a number, calls you once about it. Revocable at any time. Privacy policy


Tender documents

  • Restricted — LOT-0001RESTRICTED-DOCUMENT
  • TED HTML — 549925-2026HTML
  • TED PDF — 549925-2026PDF
  • TED XML — 549925-2026XML
Free

Unlock documents for free

Enter your email address. If you confirm, we will also send you 3 similar tenders.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email. Free, unsubscribe anytime. Privacy policy


Additional details

Electronic Submission
Required
Legal Basis
32014L0025
Live webinar

See Patterno work on a real tender

45 minutes live, questions answered in the chat. Upcoming dates on the signup page.

  • Matches from 4,500+ portals in one workspace
  • Qualify any tender against your criteria in minutes
  • Prepare bid documents from your company context

Prefer a private session?