Shell construction, concrete, earthworks, and drainage for sports hall replacement building
Earthworks, shoring, masonry, and reinforced concrete works: approx. 375 m³ of backfill to loosen and store, approx. 3,000 m³ of excavation pit to loosen and store, approx. 250 m² Berlin-type shoring, approx. 145 m² of sand-lime brick masonry, approx. 650 m³ in-situ concrete base plate, approx. 3,000 m² reinforced concrete walls (of which 1,650 m² in fair-faced concrete SB2), approx. 1,700 m² in-situ concrete ceiling slab, approx. 650 m² filigree ceiling slab, approx. 15 m³ in-situ concrete columns, approx. 14 precast stair flights, approx. 270 t reinforcing steel, approx. 2,000 m² thermal insulation made of PS rigid foam, approx. 630 m² bituminous waterproofing.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 522334-2026HTML
- TED PDF — 522334-2026PDF
- TED XML — 522334-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.