Shell Construction Works for Burgsinn Outdoor Pool Renovation
Shell construction works for the general renovation of Burgsinn outdoor swimming pool: setup of construction site, construction power, and water supply; 100 m construction fence, 200 m tree protection, 720 m² construction road, safety measures, flood protection requirements. Scaffolding works: 150 m² protective scaffolding for the diving pit. Earthworks: MZB: 265 m³ excavation, 520 m³ gravel sub-base, 41 m³ iron-free grit, 190 m³ excavation disposal; NSB (demolition): 130 m³ excavation, 160 m³ seepage gravel, 200 m³ backfilling of construction pit; SWB (demolition): 90 m³ excavation, 90 m³ backfilling, 35 m³ sub-base; SWB (new): 530 m³ excavation, 35 m³ gravel sub-base, 220 m³ backfilling of construction pit, 90 m³ soil exchange, 300 m³ excavation disposal; outdoor facilities: 250 m³ excavation for transfer level, 150 m³ excavation in planting areas, 45 m³ disposal; pipeline construction: 450 m³ excavation, 231 m³ pipeline zone backfilling, 300 m³ excavation disposal. Dewatering works: dewatering system for pools, SWB, and pipe trenches, including settling tanks. Concrete and reinforced concrete works: MZB: 115 m³ reinforced concrete, 185 m³ lean concrete, approx. 3,500 kg reinforcement, 400 m² formwork; SWB: 110 m³ reinforced concrete, 30 m³ lean concrete, approx. 12,300 kg reinforcement, 370 m² formwork; SPB: 74 m³ reinforced concrete, 2 m³ lean concrete, approx. 1,300 kg reinforcement, 40 m² formwork. Waterproofing works: 85 m² waterproofing of concrete decks. Demolition works: MZB: 50 m³ concrete demolition, 70 m² concrete saw cuts, various core drillings, diving facility; NSB: 56 m³ concrete demolition, 145 m² concrete saw cuts, 145 m² wall tiles, slide; SWB: 20 m³ concrete demolition, 16 m² concrete saw cut, attachments; outdoor facilities: 1,160 m² slab paving including sub-base, 500 m² planting strip grubbing, 2 stair systems, 3 walk-through pools, various equipment items; pipeline construction: approx. 400 m pipeline demolition; demolition of 2 shafts, construction of approx. 40 m main drainage pipe and 2 new shafts including connection to existing system.
CONTRACTING AUTHORITY
Name
Markt Burgsinn
City
Burgsinn
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45200000, Works for complete or part construction and civil engineering work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
28 days remaining(LOT-0001)
Published