Shaft deepening and two-sided shaft inlet for Shaft II of KWK „Borynia-Zofiówka“ at 1120 m level

Shaft deepening for Shaft II of KWK „Borynia-Zofiówka“ Ruch „Borynia“ and construction of a two-sided shaft inlet at the 1,120 m level. Further details are as per the tender documents.

CONTRACTING AUTHORITY

Name

Jastrzębska Spółka Węglowa S.A. z siedzibą w Jastrzębiu Zdroju, Zakład Wsparcia Produkcji

City

Jastrzębie-Zdrój

Country

PL

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45255500, Drilling and exploration work.

Other CPV

45254100, Construction work for mining.

ADDITIONAL DETAILS

Electronic Submission

Required

Legal Basis

32014L0025

DEADLINES & TIMELINE

Submission Deadline

32 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

32 days remaining

Similar Tenders

Explore CPV 45

Operation of Systems for Filling Mining Excavations with Power Plant Waste at KWK „Pniówek“

Complex services for the operation of surface and underground equipment and installations for the production and transmission of a mixture of power plant waste (by-product) and mine water, possibly with the addition of anti-pyrogenic agents, for filling goafs, mining excavations, and explosion-proof dams at KWK „Pniówek“.

Jastrzębska Spółka Węglowa S.A. z siedzibą w Jastrzębiu Zdroju, Zakład Wsparcia Produkcji

·Jastrzębie-Zdrój
Deadline:August 14, 2026

Maintenance and Service for ECOMAX 20 and ECOMAX 40 Cogeneration Systems at JSW S.A. KWK „Budryk“

Maintenance and repair services for ECOMAX 20 and ECOMAX 40 cogeneration systems: Execution of periodic inspections and service work, further items as per the tender documents.

Jastrzębska Spółka Węglowa S.A. z siedzibą w Jastrzębiu Zdroju, Zakład Wsparcia Produkcji

·Jastrzębie-Zdrój
Deadline:July 31, 2026

Cleaning of OS chamber from accumulated sediment at „Borynia-Zofiówka“ mine

Cleaning of an OS chamber from accumulated sediment at level 1080 in the „Borynia-Zofiówka“ mine, including sludge disposal and container cleaning. Further details as per the tender documents.

Jastrzębska Spółka Węglowa S.A. z siedzibą w Jastrzębiu Zdroju, Zakład Wsparcia Produkcji

·Jastrzębie-Zdrój
Deadline:August 06, 2026

Rental of six roadheading machines for JSW S.A. KWK „Borynia-Zofiówka“

We are looking for six roadheading machines capable of excavating rock with a minimum compressive strength of 90 MPa. These machines are needed for the "Zofiówka" and "Borynia" mines and include necessary additional equipment.

Jastrzębska Spółka Węglowa S.A. z siedzibą w Jastrzębiu Zdroju, Zakład Wsparcia Produkcji

·Jastrzębie-Zdrój
Deadline:August 04, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now