Hazardous Material Remediation and Demolition Part 2
Hazardous material remediation and demolition: Removal and disposal of existing glazing, removal and disposal of existing facade components contaminated with hazardous materials, remediation of existing listed and hazardous material-contaminated facade components, stripping of hazardous material-contaminated metal components, removal and disposal of existing hazardous material-contaminated sealants, creation of component openings through hazardous material-contaminated facades, and verification work. Building data: existing gross floor area (BGF): 32,308 m², existing gross volume (BRI): 161,555 m³, new construction gross floor area (BGF): 3,577 m², new construction gross volume (BRI): 18,161 m³, usable floor area (NUF): approx. 28,425 m².
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 573043-2026HTML
- TED PDF — 573043-2026PDF
- TED XML — 573043-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.