Locksmith works for new primary school building and middle school extension
Locksmith works: For the new primary school building, 1 steel staircase (roof access), approx. 10 linear meters of stair railing made of 10 mm thick, rust-proof primed steel sheet, approx. 100 linear meters of wooden handrails with steel holders, approx. 250 linear meters of steel bar railings on escape balconies, approx. 130 linear meters of steel bar railings on attic roof gardens, approx. 150 linear meters of stainless steel handrails, and approx. 730 m² of gratings are planned. The estimated installation period is from 21.02. to 30.06.2028, with W+M planning estimated from 05.07. to 06.08.2027. For the middle school extension, 1 steel staircase (ventilation central), approx. 10 linear meters of stair railing made of 10 mm thick, rust-proof primed steel sheet, approx. 87 linear meters of wooden handrails with steel holders, approx. 74 linear meters of steel bar railings on attic roof gardens, and approx. 40 linear meters of stainless steel handrails are planned. The estimated installation period is from 21.02. to 30.06.2028, with W+M planning estimated from 05.07. to 06.08.2027. For the renovation of the existing middle school building, 2 steel staircases (escape staircase with intermediate landing), approx. 24 linear meters of steel bar railings on escape staircases, approx. 130 linear meters of steel bar railings on attic roof gardens, and approx. 60 linear meters of stainless steel handrails are foreseen. The estimated installation period is from 13.09. to 29.10.2027, with W+M planning estimated from 03.05. to 18.06.2027.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 544262-2026HTML
- TED PDF — 544262-2026PDF
- TED XML — 544262-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.