Specialized Civil Engineering for Gable Stabilization at Friedrich-Ludwig-Jahn-Museum Freyburg (Unstrut)
Specialized civil engineering for gable stabilization: Production of 8 micropiles (Ø 150 mm, lengths approx. 6.5 - 12.0 m), totaling approx. 66 m of micropiles including drilling and grouting, and 12 m of cased boreholes. This includes the production of 2 reinforced concrete pile caps with approx. 1.2 m³ of reinforced concrete and rebar. Also, temporary support and bracing structures for gable and pier stabilization, injection and grouting work for load redistribution, and monument-appropriate restoration of the historical masonry.