Steel Arch Bridge for Tilkunlammi
Delivery and installation of a steel arch bridge with foundation elements for the Tilkunlammentie new construction project in Jyväskylä. Technical requirements are detailed in plan attachments 2-4 (General Drawing A-1, Bridge Construction Plan Description, Detailed Bridge Requirements). The contracting authority is responsible for earthworks and railings and acts as the main contractor for the construction site. Schedule: Client to complete groundwork and access routes by end of week 47; concrete foundation elements to be installed by week 48; client to construct stream bed structures between foundation elements; steel arch bridge installation by week 50. Earlier delivery is possible by separate agreement. A reference for the delivery and installation of a similar steel arch bridge with concrete foundation elements within the last two (2) years is required. The contracting authority does not hold construction site insurance according to YSE 98 §38; each contractor is responsible for insuring their own performance.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Procurement documentsNON-RESTRICTED-DOCUMENT
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.