Heavy Current Systems for a Building
Installation of electrical systems in a building: establishment of a safety lighting system with approx. 9 group battery systems 24 V, 1 control panel and WEB module; pre-installation for a PV system with feed-in cabinet and cabling; establishment of 7 UPS systems for laboratory power supply; establishment of a main building distribution; establishment of approx. 14 sub-distributions; laying of cable trays up to 500 mm, approx. 760 m; laying of device installation channels, approx. 300 m; laying of main lines outside the building in existing trenches, approx. 500 m; laying of halogen-free main lines inside the building, approx. 760 m; laying of halogen-free installation lines, approx. 30,000 m; laying of ALU electrical installation pipes, approx. 1,260 m; laying of halogen-free plastic electrical installation pipes, approx. 650 m; establishment of the lighting system; installation of installation devices such as switches and sockets; assembly of approx. 26 sun protection drives, including 26 MSE, weather station, software and programming; commissioning, documentation and testing of the systems; coordination with other building services trades.
CONTRACTING AUTHORITY
Name
Humboldt-Universität zu Berlin
City
Berlin
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45000000, Construction work.
Other CPV
45311000, Electrical wiring and fitting work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
31 days remaining(LOT-0000)
Published