Heavy current installations for the renovation of Albert-Einstein-School sports hall
Heavy current installations for the renovation of Albert-Einstein-School sports hall: Supply and installation of 90 safety lights, 1 emergency lighting control unit, 20 flight path indicator lights, 190 PV module support systems, 3 PV inverter systems, 1 meter distribution for PV system feed-in, 1 main distribution board, approx. 6,000 m of cables (installation type V/AP, VI, V/UP), 350 m of aluminum electrical installation conduit, 260 electrical installation devices (sockets, switches, push-buttons, motion detectors), 1 sub-distribution board (supply, install, wire), 100 lights in the area outside the sports hall; dismantling and disposal of 2 distribution cabinets, 300 system components, 100 m of cable support system, 700 m of heavy and low current cables. The dismantling and disposal of a 500 m lightning protection conductor RD 8/AL on the flat roof is not included. Execution period: within 12 working days after request, expected by September 28, 2026.
CONTRACTING AUTHORITY
Name
Kreisausschuss Main-Taunus-Kreis, Hochbau- und Liegenschaftsamt
City
Hofheim am Taunus
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45311000, Electrical wiring and fitting work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
36 days remaining(LOT-0001)
Published