Road Construction for I/50 Bučovice Bypass
Construction of road I/50 on a new route around the town of Bučovice: The construction starts west of the town, approx. 50 m before the intersection with road III/0506 to Maref at chainage km 17.690 and connects to the original route of I/50 at the end of the local part of Vícemilice at chainage km 23.530. The total length of the construction is 5,570 m. The new road alignment will be built in the initial and final sections as a directionally separated two-lane road in design category S 11.5/90; the remaining central part will correspond to category S 13.5/90 (2+1 arrangement) over a length of 1,990 m without transition wedges. The new route crosses the railway line 2 times and includes 3 grade-separated intersections, 6 bridges on road I/50, 1 bridge over road I/50, 2 bridges outside road I/50, and 3 retaining walls designed as separate structures. Also part of the construction are 2 at-grade intersections, 6 relocations of lower category roads, 2 access roads to retention basins, exits, and temporary bypass roads. Furthermore, water management facilities, relocation of affected utility networks, construction of embankment bodies, and noise barriers are an integral part of the construction.
CONTRACTING AUTHORITY
Name
Ředitelství silnic a dálnic s. p.
City
Praha
Country
CZ
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45233120, Road construction works.
ADDITIONAL DETAILS
EU Funded
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
30 days remaining(LOT-0001)
Published